Software Development Life Cycle (SDLC)

1. SDLC stands for:
A. Software Design Life Cycle
B. Software Development Life Cycle
C. System Development Level Cycle
D. Software Data Life Cycle

Answer: B

2. Which SDLC phase primarily determines what the software should do?
A. Coding
B. Requirement Analysis
C. Testing
D. Maintenance

Answer: B

3. SRS stands for:
A. Software Requirement System
B. Software Requirements Specification
C. System Requirement Software
D. Software Resource Specification

Answer: B

4. Which of the following is a functional requirement?
A. System should respond within 2 seconds
B. System should have 99.9% availability
C. User can register an account
D. System should use encrypted communication

Answer: C

5. Which of the following is a non-functional requirement?
A. User can log in
B. User can generate a report
C. System should respond within 2 seconds
D. Admin can delete a user

Answer: C

6. Which type of feasibility examines whether the required technology and technical resources are available?
A. Economic feasibility
B. Technical feasibility
C. Operational feasibility
D. Legal feasibility

Answer: B

7. Economic feasibility primarily evaluates:
A. Programming language
B. Costs and expected benefits
C. User interface design
D. Database normalization

Answer: B

8. Which document formally describes the software requirements?
A. SRS
B. DFD
C. Gantt Chart
D. Source Code

Answer: A


Software Design and UML

9. HLD stands for:
A. High-Level Design
B. Hardware-Level Data
C. High Logic Development
D. Hardware Logic Design

Answer: A

10. LLD stands for:
A. Logical Link Design
B. Low-Level Design
C. Local Level Development
D. Low Logic Data

Answer: B

11. Which combination is generally desirable in good software design?
A. High coupling and low cohesion
B. Low coupling and high cohesion
C. High coupling and high cohesion
D. Low coupling and low cohesion

Answer: B

12. Cohesion measures the:
A. Dependency between modules
B. Degree of relatedness among elements within a module
C. Project cost
D. Number of test cases

Answer: B

13. Coupling measures the:
A. Dependency between modules
B. Internal relatedness of a module
C. Number of users
D. Number of test cases

Answer: A

14. Which is generally considered the strongest form of cohesion?
A. Coincidental cohesion
B. Logical cohesion
C. Sequential cohesion
D. Functional cohesion

Answer: D

15. UML stands for:
A. Unified Modeling Language
B. Universal Machine Language
C. Unified Machine Logic
D. User Modeling Language

Answer: A

16. Which UML diagram represents actors and their interactions with a system?
A. Class Diagram
B. Use Case Diagram
C. Sequence Diagram
D. Deployment Diagram

Answer: B

17. Which UML diagram shows interactions between objects in a time-ordered sequence?
A. Class Diagram
B. Sequence Diagram
C. Component Diagram
D. Deployment Diagram

Answer: B

18. Which UML diagram represents classes, attributes, and operations (methods)?
A. Class Diagram
B. Use Case Diagram
C. Activity Diagram
D. Sequence Diagram

Answer: A


SDLC Models and Agile

19. Which SDLC model follows a predominantly sequential approach?
A. Waterfall
B. Agile
C. Spiral
D. Prototype

Answer: A

20. Which SDLC model explicitly emphasizes risk analysis?
A. Waterfall
B. Spiral
C. V-Model
D. Incremental Model

Answer: B

21. The Prototype Model is particularly useful when:
A. Requirements are completely fixed
B. Requirements are unclear or evolving
C. User feedback is unnecessary
D. Testing is not required

Answer: B

22. Which SDLC model emphasizes the relationship between development activities and corresponding testing activities?
A. V-Model
B. Spiral Model
C. Prototype Model
D. Waterfall Model

Answer: A

23. Agile development emphasizes:
A. No customer involvement
B. Responding to changing requirements
C. One-time delivery only
D. Testing only at the end

Answer: B

24. Which of the following is an Agile framework?
A. Scrum
B. Waterfall
C. V-Model
D. Big Bang Model

Answer: A

25. In Scrum, a fixed-length development cycle is called a:
A. Phase
B. Sprint
C. Stream
D. Milestone

Answer: B

26. Who is primarily responsible for maximizing product value in Scrum?
A. Scrum Master
B. Product Owner
C. Tester
D. System Administrator

Answer: B


Software Testing

27. The primary purpose of software testing is to:
A. Write source code
B. Identify defects and evaluate software quality
C. Design computer hardware
D. Create database tables

Answer: B

28. Testing individual units or modules of software is called:
A. System Testing
B. Integration Testing
C. Unit Testing
D. Acceptance Testing

Answer: C

29. Testing the interaction between integrated modules is called:
A. Unit Testing
B. Integration Testing
C. Acceptance Testing
D. Regression Testing

Answer: B

30. Testing the complete integrated software system is called:
A. Unit Testing
B. System Testing
C. Module Testing
D. Component Testing

Answer: B

31. Testing performed to determine whether software meets user/customer acceptance criteria is:
A. Unit Testing
B. Acceptance Testing
C. Integration Testing
D. White-Box Testing

Answer: B

32. Black-box testing primarily focuses on:
A. Internal code structure
B. Inputs, outputs, and externally observable behavior
C. CPU architecture
D. Source-code optimization

Answer: B

33. White-box testing primarily focuses on:
A. Internal logic and code structure
B. User interface only
C. Customer satisfaction only
D. Hardware configuration

Answer: A

34. Which of the following is a white-box testing technique?
A. Boundary Value Analysis
B. Equivalence Partitioning
C. Branch Coverage
D. Decision Table Testing

Answer: C

35. Which of the following is a black-box testing technique?
A. Statement Coverage
B. Branch Coverage
C. Path Coverage
D. Equivalence Partitioning

Answer: D

36. Regression testing is performed to:
A. Test computer hardware
B. Ensure that changes have not adversely affected existing functionality
C. Create software requirements
D. Estimate project cost

Answer: B

37. Smoke testing is primarily performed to:
A. Test every possible input
B. Check whether a build is stable enough for further testing
C. Replace system testing
D. Test only database performance

Answer: B

38. Alpha testing is generally performed:
A. By random Internet users
B. In a controlled environment by the development organization
C. After software retirement
D. Only by hardware vendors

Answer: B

39. Beta testing generally involves:
A. Selected external users
B. Only programmers
C. Only database administrators
D. Software compilers

Answer: A


Verification, Validation and Debugging

40. The question "Are we building the product right?" is associated with:
A. Validation
B. Verification
C. Debugging
D. Maintenance

Answer: B

41. The question "Are we building the right product?" is associated with:
A. Verification
B. Validation
C. Compilation
D. Integration

Answer: B

42. Which process involves finding and fixing the cause of a software defect?
A. Testing
B. Debugging
C. Requirement Analysis
D. Scheduling

Answer: B


Software Maintenance

43. Corrective maintenance is performed to:
A. Adapt software to a new operating environment
B. Fix defects and errors
C. Add only new features
D. Improve hardware performance

Answer: B

44. Adaptive maintenance deals primarily with:
A. Changes in the operating or external environment
B. Fixing coding errors only
C. Removing software requirements
D. Project scheduling

Answer: A

45. Perfective maintenance generally focuses on:
A. Improving functionality, performance, or usability
B. Fixing computer hardware
C. Removing documentation
D. Replacing testers

Answer: A

46. Preventive maintenance aims to:
A. Improve maintainability and reduce the likelihood of future problems
B. Eliminate software testing
C. Increase coupling
D. Remove documentation

Answer: A


Software Project Management

47. WBS stands for:
A. Work Breakdown Structure
B. Web-Based System
C. Work Base Schedule
D. Web Breakdown System

Answer: A

48. The primary purpose of a Work Breakdown Structure (WBS) is to:
A. Divide a project into manageable deliverables and work packages
B. Encrypt software
C. Test source code
D. Design a database

Answer: A

49. A Gantt chart is primarily used for:
A. Network security
B. Project scheduling and tracking
C. Source-code compilation
D. Database normalization

Answer: B

50. PERT stands for:
A. Project Evaluation and Resource Technique
B. Program Evaluation and Review Technique
C. Program Engineering and Review Tool
D. Project Engineering Resource Tool

Answer: B

51. The commonly used PERT expected-time formula is:
A. (O + M + P) / 3
B. (O + 4M + P) / 6
C. (O + 2M + P) / 4
D. (O + M + 4P) / 6

Answer: B

52. If Optimistic Time (O) = 2, Most Likely Time (M) = 5, and Pessimistic Time (P) = 8, the PERT expected time is:
A. 4
B. 5
C. 6
D. 7

Answer: B

Calculation:
TE = (O + 4M + P) / 6
TE = (2 + 4×5 + 8) / 6
TE = 30 / 6 = 5

53. CPM stands for:
A. Critical Path Method
B. Computer Project Management
C. Critical Program Model
D. Computer Path Management

Answer: A

54. In project scheduling, the critical path determines the:
A. Maximum number of programmers
B. Minimum project completion time
C. Number of software requirements
D. Number of modules

Answer: B

55. Activities on the critical path generally have:
A. Maximum float
B. Zero total float
C. Unlimited float
D. Negative cost

Answer: B

56. Risk Exposure is commonly calculated as:
A. Probability + Impact
B. Probability × Impact
C. Probability − Impact
D. Impact ÷ Probability

Answer: B


Software Estimation – COCOMO

57. COCOMO was developed by:
A. Dennis Ritchie
B. Barry Boehm
C. James Gosling
D. Edsger Dijkstra

Answer: B

58. COCOMO is primarily used for:
A. Software effort and cost estimation
B. Network routing
C. Database encryption
D. User interface design

Answer: A

59. In COCOMO, KLOC refers to:
A. Kilo Lines of Code
B. Key Lines of Computer
C. Kernel Lines of Code
D. Knowledge Level of Code

Answer: A

60. Which combination generally indicates good software design?
A. High coupling + low cohesion
B. Low coupling + high cohesion
C. High coupling + high cohesion
D. Low coupling + low cohesion

Answer: B


Bihar STET – Software Engineering Quick Revision
  • SDLC → Software Development Life Cycle

  • SRS → Software Requirements Specification

  • Functional Requirement → Specifies what the system should do

  • Non-Functional Requirement → Specifies quality attributes or constraints

  • Technical Feasibility → Checks technical viability and resources

  • Economic Feasibility → Evaluates costs and benefits

  • HLD → High-Level Design

  • LLD → Low-Level Design

  • Good Software Design → High cohesion + Low coupling

  • Cohesion → Relatedness within a module

  • Coupling → Dependency between modules

  • UML → Unified Modeling Language

  • Use Case Diagram → Actors and system interactions

  • Class Diagram → Classes, attributes, and methods/operations

  • Sequence Diagram → Interactions in time sequence

  • Waterfall → Sequential development model

  • Spiral → Risk-oriented development model

  • Prototype Model → Useful when requirements are unclear

  • V-Model → Verification and validation-oriented model

  • Agile → Iterative, incremental, and adaptive development

  • Scrum → Agile framework

  • Sprint → Fixed-length development cycle in Scrum

  • Product Owner → Maximizes product value

  • Unit Testing → Tests individual units/modules

  • Integration Testing → Tests interactions between modules

  • System Testing → Tests the complete integrated system

  • Acceptance Testing → Determines whether software meets acceptance criteria

  • Black-Box Testing → Focuses on external behavior without relying on internal code structure

  • White-Box Testing → Focuses on internal code/logic

  • Branch Coverage → White-box testing technique

  • Equivalence Partitioning → Black-box testing technique

  • Regression Testing → Checks whether changes affect existing functionality

  • Smoke Testing → Checks basic build stability

  • Alpha Testing → Controlled testing within/development organization

  • Beta Testing → Testing by selected external users

  • Verification → "Are we building the product right?"

  • Validation → "Are we building the right product?"

  • Debugging → Finds and fixes the cause of defects

  • Corrective Maintenance → Fixes defects

  • Adaptive Maintenance → Adapts software to environmental changes

  • Perfective Maintenance → Improves functionality, performance, or usability

  • Preventive Maintenance → Reduces future maintenance problems

  • WBS → Work Breakdown Structure

  • Gantt Chart → Project scheduling and tracking

  • PERT → Program Evaluation and Review Technique

  • PERT Expected Time → (O + 4M + P) / 6

  • CPM → Critical Path Method

  • Critical Path → Determines minimum project duration

  • Critical Path Activities → Generally have zero total float

  • Risk Exposure → Probability × Impact

  • COCOMO → Software effort/cost estimation

  • KLOC → Thousand Lines of Code

Why This Content Matters

This content is prepared to help students and competitive-exam aspirants understand important topics, revise key information, and strengthen their exam preparation.

  • Quickly revise important facts and concepts
  • Improve General Knowledge and exam awareness
  • Support preparation for competitive and government exams
  • Build a consistent and effective study routine
Quizer Team
About the Author

Quizer Team

The Quizer Team creates exam-focused educational content, current affairs, general knowledge, study notes, and preparation resources to help students and competitive-exam aspirants learn, practice, and stay updated.

Educational Content Exam Focused Learning Resources

📢 Join Our WhatsApp Channel

Get Daily GK, Current Affairs, Amazing Facts & Quiz Updates.

🚀 Join Now

Join Monthly Challenge

Compete, Learn & Win exciting prizes.

  • Cash Rewards
  • E-Certificates
  • Leaderboard Ranking
  • Daily Practice
Join Now

Related Post

Study Material
7 Oct 2026 77
Read More
Study Material
30 Sep 2026 124
Read More
Study Material
30 Sep 2026 113
Read More